20.11.13 – 06.12.13: Planned Work at Preseli

Essential transmitter maintenance will result in reduced power, switching breaks and a loss of redundancy for up to two hours on two days.

Essential transmitter maintenance will result in reduced power, switching breaks and a loss of redundancy for up to two hours on two days.

Comments

Leave a Reply

Your email address will not be published. Required fields are marked *