Essential transmitter maintenance will result in reduced power, switching breaks and a loss of redundancy for up to two hours on two days.
06.01.14: Planned Work at Churchdown Hill
Leave a Reply
Essential transmitter maintenance will result in reduced power, switching breaks and a loss of redundancy for up to two hours on two days.